Security Deposit:
30% of venue rental fee
Usage Restrictions and Precautions
. There are no sound system and projection equipment in this space, applicants should prepare by yourselves.
. Do not rinse paint brush and tools in sink.
. If you need to tap the power supply from the electric panel, you must obtain the permission of the site management unit in advance, and it should be commissioned by a professional electrician.
Area
[1F]: 324.2 m2
[2F]: 345.2 m2
Other Instructions
電力規格:3∮4W 208V/120V
一樓總無熔絲開關(NFB)為 100AT
二樓總無熔絲開關(NFB)為 150AT